Facts and Figures
* At the project peak over 1000 construction workers will be working on the site
* The total area of the construction site (including mobilization areas) is 254,907 m2
* The land (including pitch), where the Stadium will be located, is 46,780 m2
* The height of the new stadium will be 54m from pitch level to the top of the roof.
* There will be 227 Toilet rooms with 471 WC and 333 Wash Basins
* Over 120.000 m3 of Concrete will be poured during construction of the Stadium
* Approximately 4300 tones of Steel will be used for construction
* Approximately 3800 tones of Steel will be used for the roof structure.
* Total glazing area is approximately 24.000 m2
* The total area of the tires will be approximately 70.000 m2
* The size of the football field will be 105 m x 68 m, and 7668 m2 natural turf will be used with 2201 m2 synthetic turf
* Intended for 50,000 spectators
* The project of the staium with a set-up park around it cost USD 400m.
* At the project peak over 1000 construction workers will be working on the site
* The total area of the construction site (including mobilization areas) is 254,907 m2
* The land (including pitch), where the Stadium will be located, is 46,780 m2
* The height of the new stadium will be 54m from pitch level to the top of the roof.
* There will be 227 Toilet rooms with 471 WC and 333 Wash Basins
* Over 120.000 m3 of Concrete will be poured during construction of the Stadium
* Approximately 4300 tones of Steel will be used for construction
* Approximately 3800 tones of Steel will be used for the roof structure.
* Total glazing area is approximately 24.000 m2
* The total area of the tires will be approximately 70.000 m2
* The size of the football field will be 105 m x 68 m, and 7668 m2 natural turf will be used with 2201 m2 synthetic turf
* Intended for 50,000 spectators
* The project of the staium with a set-up park around it cost USD 400m.